High Reliability Commissioning
- Tier Rated Facilities
- Perform design reviews during design process
- Perform system reliability fault/failure analysis on system design
- Verify the installation and performance of the following systems to be commissioned – Sample list of equipment includes;
- Chiller Plants
- Secondary VRF
- CRAC
- Paralleling Switchboards
- Paralleling Generators
- Control Systems
- Fully Integrated Systems Testing
- Full Building “Pull the Plug” Testing
- Electrical sub-metering
- Maintain an issues and benefits log documenting findings
- Provide a complete a summary commissioning report
- Compile a Current Facility Requirements and Operations and Maintenance Plan from documents provided by the owner, design team, and contractors